Fluminense Crane Replacement

Location

Nameplate Capacity

Keystone provided project management, detailed design, and construction management to install a provisional replacement crane located off the coast of Brazil. The replacement crane used a dynamically positioned floatel for lift support.

Keystone coordinated with multiple parties and managed the construction of the removal, assembly, and reinstallation of the crane. The scope of work also included the cut and removal of an existing pedestal and planning, transportation, and sea fastening of both cranes.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.