Gangway Additions

Docks & Terminals

Location

Nameplate Capacity

Provided FEED selection and layout of vertical track gangway, detailed design of support structure, and interface with gangway vendor and fabricator/installer throughout the project.  Leveraged laser scan and 3D model to interface with existing hose tower access system and minimize footprint.  Located obstructions to facilitate prep/demo work, minimizing dock downtime.  Provided access platforms as required.  Performed structural analysis and design of new operator building support structure and existing deck for new loads.