Delivery Point

Upstream

Location

Nameplate Capacity

Keystone provided project management, engineering, and design services to add a new offtake/delivery point at the existing Dewitt Central Facility. The project design of the new offtake/delivery point at the current facility pad involved 40Mbpd of unstabilized oil from the Eagle Ford asset. The design also provided constant flow with the existing stabilizer and utilized the existing Eagle Ford Pipeline pressure to provide the motive force.

The scope of the work associated with the new delivery point included a new incoming 12” lateral, 12” pig receiver, provisions for future booster pumps (preliminary sizing, space/footprint requirements, flanged tie-points, and I&E spares), dual/redundant free Water Knock Out packaged skids, interconnecting piping to available tie-points, interconnecting I&E back to the existing facility control system, sleeper/rack supports, and 480VAC power supply to switchrack.