Sour Water Stripper Unit

Downstream

Location

Nameplate Capacity

To support an increase in the Sour Water System's capacity, Keystone provided project management, engineering, and design services for the FEL 3 and detailed design phases of the project. The new system design included a capacity of 120 GPM sour water charge and 40 GPM turndown case.

The scope of work for the new Sour Water System Unit included sour water feed pumps, sour water feed/product exchangers, stripper tower, pump around pumps, overhead cooler, sour water reboiler, tempered water pumps, and a sump pump. Additionally, the new unit tied into steam, instrument air, and power systems.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.